We welcome all homebuyers at Neco Park Central to the second edition of our quarterly newsletter, which we shall be publishing at a regular interval of 3 months. Through this newsletter, we will be providing construction updates at our project - Neco Park Central, interesting trivia about design or engineering aspects that we use and also updates of development work in and around Kharadi.
|
Pune has been fortunate to have receive healthy rains this year starting a month in advance, which should hopefully ensure more water in our dams for better water distribution for the year ahead!
Latest update about Neco Park Central
Our construction work is progressing at a rapid pace. The excavation and foundation works are finished while RCC work at the Parking Levels is in progress. We are almost about to finish the Lower Ground Floor work, whereas the Ground Floor Work has also commenced simultaneously.
Local News around Kharadi
The central government has approved the Pune Metro Phase 2, which will be extending the existing Pune Metro Line 2 from Vanaz to Chandni Chowk and from Ramwadi to Wagholi. We can expect tendering to commence for this shortly and hopefully this project should be completed by the time Neco Park Central is delivered. In a major infrastructure development, the Maharashtra State Government has approved the construction of a double-decker flyover from Phoenix Market City Mall to Kharadi Jakat Naka. Both these developments are expected to decongest Pune-Ahilyanagar (formerly Nagar Road significantly).
|
Know your project – Neco Park Central
|
In this section, we will discuss about the different design & engineering aspects of the project. Do read this section as it will enlighten you on the various technical features within Neco Park Central.
|
Aluform Shuttering & RCC Walls
|
Aluform shuttering, also commonly known as Mivan formwork, is a revolutionary construction technique that has gained significant popularity in high-rise residential building projects. This system leverages high-strength aluminium panels that are precisely manufactured and easily assembled on site to create moulds for pouring reinforced concrete. One of the standout features of Aluform is its modularity, allowing the same set of lightweight, reusable panels to construct walls, floors, columns, and slabs with exceptional speed and precision. The system’s pin-and-wedge locking mechanisms make assembly and disassembly straightforward, enabling slab construction cycle times significantly faster than traditional shuttering methods.
At Neco Park Central, we’re using Aluform shuttering to expedite the structural casting of our vertical members like retaining walls, internal walls and columns. The RCC walls provide superior structural strength and stability, which is crucial for tall buildings subject to significant wind and seismic forces. Their increased thickness and monolithic cast-in-place construction ensure excellent durability, sound insulation, and fire resistance—enhancing the overall safety and comfort of residents.
|
Construction Progress (Updated on July 2025)
|
Excavation Work – Completed
Building Foundation & Footings – Completed
Lower Ground Floor Parking – In progress
Ground Floor Parking – In progress
|